Concrete Calculator (Small Projects)

For patios, paths, shed bases and post holes, the real question is not just volume — it is whether you are mixing bags or ordering ready-mix. This calculator gives you the volume and all three bag counts so you can decide with the numbers in front of you.

slab length — 12 ft in the worked example 4 in thick concrete slab — volume = length × width × thickness compacted sub-base — supports the slab, not part of its volume ground two extra inches of thickness add half as much concrete again to the same footprint
A small slab in cross-section. Only the grey layer is concrete the calculator counts; the sub-base underneath is a separate material, and the thickness figure is the one that quietly decides between bags and ready-mix.

How to use the concrete calculator

Enter the finished slab's length and width, then choose the thickness by what the slab has to carry, not by habit. Four inches is the standard for foot traffic: patios, garden paths, greenhouse and shed bases on firm ground. Six inches is the driveway figure, where wheel loads concentrate at the edges. Thickness is the most powerful number on this page — going from 4 to 6 inches multiplies the concrete by one and a half — so it is worth a moment's thought about the actual load. The waste allowance exists because no excavation is perfectly level: a base that dips an extra half inch in the middle consumes that volume in concrete, invisibly, and 10% is the allowance that keeps a bag-mixed job from ending one bag short with a half-finished slab curing behind you. If you are ordering ready-mix, the same allowance protects you against the far worse outcome of a truck leaving before the pour is complete.

Then look at the bag counts before you romanticise mixing it yourself. An 80 lb bag yields 0.6 cubic feet of concrete; a 60 lb bag yields 0.45; a 40 lb bag yields 0.3. Those small yields are the whole story of small-project concrete: volumes that sound modest in cubic yards become dozens of heavy bags, each of which must be lifted, opened, mixed with the right amount of water, placed and compacted before the batch stiffens.

The formula: volume, then yield

Volume is length × width × thickness, with thickness converted to feet. A 10 × 10 ft slab at 4 inches is 100 × ⅓ = 33.33 cubic feet, which is 1.23 cubic yards or 0.94 m³. Bag counts divide the waste-inclusive volume by the bag yield: at 10% waste the slab needs 36.67 cubic feet of mixed concrete, which is 62 bags of 80 lb, 82 bags of 60 lb, or 123 bags of 40 lb. Every figure the calculator prints can be reproduced with those two steps and a pocket calculator, and the worked examples in our guides use exactly these numbers.

Worked example: a 12 × 10 ft patio

A patio of 12 × 10 ft at 4 inches thick has a volume of 40 cubic feet — 1.48 cubic yards (1.13 m³). With 10% waste, the bag counts are 74 × 80 lb, 98 × 60 lb, or 147 × 40 lb. Read those numbers as a decision, not a shopping list: 74 bags is roughly three and a half thousand pounds of dry mix to move twice — once off the delivery, once into the mixer — and a full day of continuous mixing for two people. Most patios this size are ready-mix jobs with a wheelbarrow crew, or a bulk-bag-and-mixer compromise only for the very determined. Drop to a 20 × 3 ft path at the same thickness and the picture flips: 20 cubic feet, 0.74 cubic yards, 37 bags of 80 lb — a long morning's mixing, entirely reasonable by hand. The calculator's job is to show you which side of that line your project sits on before you commit.

Bag yields and thickness reference

ItemFigureNotes
80 lb (36 kg) pre-mix bag0.6 cu ft yieldFewest lifts per cubic foot; the heaviest bag to handle
60 lb (27 kg) pre-mix bag0.45 cu ft yieldA common middle choice for solo working
40 lb (18 kg) pre-mix bag0.30 cu ft yieldEasiest to lift; roughly double the bag count of 80 lb
4 in slab0.33 cu ft per sq ftPatios, paths, bases for sheds and greenhouses
6 in slab0.50 cu ft per sq ftDriveways and vehicle loads; 50% more concrete than 4 in
One cubic yard27 cu ft ≈ 45 × 80 lb bags (before waste)The practical ceiling for hand mixing is well below this

Concrete mistakes that ruin pour day

Adding too much water is the classic: a sloppy mix is easy to place and weak forever, because the excess water leaves voids as it dries. Follow the bag's water measure even when the mix looks stiff. The second mistake is under-ordering bags to keep the receipt small and then stretching the last batch thin across the final corner — that corner is where the slab will crack first. Third is forgetting the sub-base: this calculator prices the slab only, and a patio also needs compacted hardcore or gravel beneath it, which the Mulch & Gravel Calculator can size by area and depth. Fourth, no plan for the clock: bag-mixed concrete must be placed continuously, so a slab whose bag count implies six hours of mixing needs either more hands, a bigger mixer, or ready-mix. Finally, curing is not optional — a slab kept damp and covered for its first days gains the strength the bag promised; a slab left to bake on a hot afternoon does not, whatever the calculator said.

Concrete calculator FAQ

When should I switch from bags to ready-mix?

As a planning rule, once a job passes about half a cubic yard — roughly 25 to 30 bags of 80 lb — ready-mix deserves a serious quote, and past a full cubic yard it is the sensible default unless access makes a truck impossible. Our bag yield guide works through the crossover on the 10 × 10 slab.

Does the calculator include the sub-base?

No. It calculates the slab itself. Size the compacted sub-base separately, typically 2–4 inches of hardcore or gravel over the same footprint, using the volume method on the mulch and gravel page.

How thick should a shed base be?

Four inches over a compacted sub-base serves most garden sheds and greenhouses; a heavy workshop shed or one carrying machinery deserves 5–6 inches. An 8 × 6 ft base at 6 inches is 24 cubic feet — 45 bags of 80 lb with waste — which the guide to slab thickness discusses alongside driveways and patios. This is general guidance, not structural advice; anything carrying a building or a vehicle should follow local code and, where required, a professional's specification.

Why do bag counts differ so much between sizes?

Because yield scales with bag weight while the count rounds up at every step. Smaller bags are kinder to your back and noticeably more expensive per cubic foot — you are paying for packaging and convenience, which is a fair trade on a path and a poor one on a patio.

Can I use this for post holes and footings?

Approximately: treat a run of post holes as one long thin slab is wrong, but a single hole is a small box — enter its length and width as the slab dimensions and its depth as a custom thickness via the 6 in setting scaled by hand, or simply multiply hole volume (length × width × depth in feet) and divide by the bag yields in the table above.

The patio slab estimate lays out a full pour-day plan around the 12 × 10 example, including the tools, the sub-base and the order of work from first bag to final cure.

Sources for the rates on this page

The bag yields used here — 0.60, 0.45 and 0.30 cubic feet from 80, 60 and 40 lb bags — are the yields the pre-mix manufacturers publish for their own products: they are the figures behind the QUIKRETE volume calculator and its concrete mix product data, and they agree with Sakrete's published calculators to within rounding. The methodology page lists the full sources.